#2026NPPF: 5 bits that aren’t working

Imagine. You’re in the smoky, power-filled corridors of the Ministry on Marsham Street in the heart of Westminster. And it’s policy-drafting time. I hope you’ve had your coffee, because we need results. Your boss, and indeed your boss’s boss (the BIG boss) needs the NPPF to actually work this time. Reforms to national planning policy are “integral” to their mission to “kickstart economic growth”. Heck, the last round of reforms you are trying replace were relied on to justify GDP increases of several billion pounds (billions of pounds which have yet to materialise). So. Don’t muck it up.

Now, we already have a “tilted balance”, but that’s old hat. The Minister wants something punchier - remember, we’ve got 1.5 million homes to not build. So what sounds even more tilty than a “tilted balance”? A “default yes”… mmm. That could work. A “clear, rules-based system” - right, now we’re getting somewhere. How about - hang on, everyone, listen to this - how about… a “universal tilt”. Mic drop moment. Pens away. Ladies and gentlemen, we have a policy.

Don’t we?

2 months or so into the life of our new NPPF (initial quick hits here) we now know - for all the good bits, and there are good bits - cracks are already starting to show. Important cracks. Cracks that are going to make this “tilt” an awful lot less “universal” than the minister appears to think it should be. Time for a re-draft, anyone?

What am I talking about? So soon? Well… let me give you 5 examples:

1. A “substantial” problem

Sometimes, national policy gives us a steer on how much weight different things should attract in the planning balance, e.g. under the old 2024 NPPF:

2. Exceptions swallowing rules

“In applying this policy, the circumstances in which the benefits of approving development proposals are likely to be substantially outweighed by adverse effects include, but are not restricted to, situations where the development proposal would fail to comply with one of the national decision-making policies which state that development proposals should be refused in specific circumstances.”

I tell you, whatever else these S4 and S5 policies amount to, they are neither “clear” nor “rules-based”.

3. Needing to show “need”

This “universal tilt” may require you e.g. at S5(1)(j) to prove you’re meeting:

“an evidenced unmet need (including, but not limited to, development proposals involving the provision of housing where the local planning authority cannot demonstrate a five year supply of deliverable housing sites or scores below 75% in the most recent Housing Delivery Test)”.

Two problems with this:

  • First, it’s properly ambiguous. The ambiguity was explained by Simon Ricketts here. Long story short, it isn’t clear whether housing proposals are intended to be able to evidence unmet need even in cases where an authority could demonstrate a 5 year housing land supply and in excess of 75% HDT score. A planning inspector thought that there could be other ways of meeting the trigger (e.g. focussing on unmet needs for affordable housing). The minister suggested the opposite. Maybe we’ll find out soon. What a mess.

  • Second, it’s internally inconsistent. When we get to green belt policy under GB7(1)(g)(ii) we get the same phrase: applicants need to show

    “an evidenced unmet need for the type of development proposed […] Which, in the case of applications involving the provision of housing, means the lack of a five year supply of deliverable housing sites, including the relevant buffer where applicable, or where the Housing Delivery Test result was below 75% of the housing requirement over the previous three years”

    But hang on. Is that supposed to be different? Where’s the “including, but not limited to” language from the S5 definition? Why on earth would there be a rational intention to define the same phrase in materially different ways in different bits of the policy document? Well - two options really. Either the government needs to confirm its position prontissimo, or the High Court will have to get into it before long.

4. Are we “well-related” yet?

Your clear, rules-based, default, universal tilt only actually operates for S5(1)(j) sites if the site is “physically well-related to an existing settlement (unless the nature of the development would make this inappropriate)”.

What. On. Earth. Does. That. Mean.

Does it only apply to sites that are physically contiguous to the existing settlement? No - it could’ve said that. Indeed, HO10(2)(a) says “adjoin or be physically well-related to a settlement”. The drafters distinguish the two, so “well-related” clearly isn’t just contiguity

Is it about having good transport/walking routes in and out of the settlement… maybe, I guess? Is it just about that? Or does it mean something more? And what kind of developments would not be “appropriate” to consider under this criterion? No idea.

In one decision, an Inspector (who went on to grant planning permission anyhow) decided that a site wasn’t physically well-connected to a settlement because it caused limited harm to “the character and appearance of the area, it would also harm the setting and context of the village” even though it was “very close to the settlement […] it can be accessed from an existing road within the settlement and is well located in terms of facilities and services”. The difficulty there is that all greenfield development (which is what S5 is targeted at in the first place) will cause at least limited harm to local character and appearance. So. We need guidance. We really do.

5. Getting in the way of “strategic sites”

HO13 is about, among other things, supporting strategic sites. And it’s a powerful piece of policy. The tricky bit comes at (4):

“4. Where an emerging development plan (however advanced) proposes to allocate one or more strategic sites, development proposals should not be inconsistent with the proposed scale, location and phasing of those strategic sites. This applies notwithstanding the application of policy DM4(2) where relevant.”

I have questions. Many questions. For instance:

  • Again with the ambiguity. Is this just about sites which are part of or next to an emerging wider parcel (i.e. don’t do something speculative that stops the wider scheme from coming forward)? Or is it intended to cover competing strategic sites in the same plan area (i.e. don’t bring forward a new town over here, because the emerging local plan wants a new town over there). Totally unclear.

  • What happens if you are inconsistent with HO13(4) - is it a refusal under e.g. S5(2)? It doesn’t say that. Urgh. See above. Groan.

  • Isn’t “however advanced” a pretty awful idea? You could have an incredibly early stage consultation draft plan with some vague blobs on a map. It could be totally inconsistent with national policy. It could be pre-examination. It could be subject to hordes of objections. Those objections could be (who knows) well-founded. The plan may be years away from adoption. It may never be adopted. The planners might agree that the emerging local plan gets next-to-no weight. They might also agree that there’s no DM4 prematurity objection because e.g. the emerging plan is not at an advanced stage. But then… what… notwithstanding all of that we’re supposed to do nothing to disturb its vision for strategic sites. Why? Why. Why.

A certain senior Inspector I know likes to say that planning is, or should be, mainly common sense. That’s a mantra we should be getting behind, isn’t it. Well, I tell you, say what you want about the new NPPF. Commonsensical it ain’t (and I haven’t even gotten into the definitions of reasonable walking distance to well-connected stations yet!!!!). What do we need? A definition of the S5(2) policies. Guidance on what “well-related” means. We need a clearer steer on how these myriad, “substantial” relativities are actually to be resolved. And we need it soon.


Anyhow, enjoy those shortening evenings and the crunchy leaves underfoot #planoraks. We’re firmly into woolly jumper / winter coat season. And get out the popcorn and the JR-o-meter for the brave, hearty authorities refusing to acknowledge the national scheme of delegation that is literally already part of the law and kicking in at the end of this month. That’ll be fun. In the meantime, here’s praying for some PPG to sort out all the above. Until we get it - stay cool, #planoraks. Keep warm. I hope you’re well. And through all the madness, do your level best to #keeponplanning.